Daily Log - BC

5/5/17 - As the blog guru, I added some pages to our blog and additional information to previous posts. We then tested a few pre-built ROV's in the small pool to see how they handle in the water.

5/8/17 - Today I gave the blog a bit of a facelift. I added images to the pages that required them and cleaned up each page so it looks neat and tidy.

5/10/17 - Today I practiced soldering wires and stripping them with the wire strippers. I also made some changes to our blog.

5/12/17 - Today I assembled the motors and added loctite to each screwed connection of the motors.

5/15/17 - Today I began the tethering process. I stripped all of the motor wires and the tether. We are going to solder next time.

5/17/17 - Today I worked on connecting our motors to the tether and adding waterproofing to our connections.

5/19/17 - Today I soldered the motor connections and hot glued to waterproof.

5/22/17 - Today I waterproofed and sealed the tether/motor connection and mounted it into the frame.

No comments:

Post a Comment

May 22nd

Today we waterproofed our motor/tether connection and mounted it into our frame. We weighed our ROV's total weight with the motors mount...